CONTACT / ENGINEERING DESK
Get the Spec Sheet and a Quote
Tell us the capacity, deck, site and incoterm. Our engineering desk replies with a documented specification and a quotation, not a single unexplained number.
We are a weighing equipment manufacturer based in Yantai, Shandong, China, building truck weighing scales and weigh-in-motion systems for distributors, contractors and site procurement teams. The fastest way to a useful quote is to give us the parameters below; the more of them you supply, the tighter the specification we can return.
Lead time is around 60 days from a confirmed drawing, the minimum order is 1 unit, payment is by T/T, and we quote EXW, FCA, FOB, CNF, CIF, DAP or DDP. There is no obligation and no automated sales sequence: an engineer reads the request.
What to include
- Heaviest gross vehicle weight and axle configuration
- Preferred deck length: 3,500 x 1,000 mm or 4,200 x 1,000 mm
- Pit or pitless foundation, static or weigh-in-motion
- Site country, destination port and preferred incoterm
- Estimated quantity and whether commissioning is needed
Prefer email? Write to guankai@xhlmarketing.com. If the form is unavailable, the page shows the same address as a fallback.

BEFORE YOU WRITE / SHORTCUTS
Find the spec first
If you are still choosing, the capacity hub and the construction page will give you the numbers to put in the form. The price guide explains why we ask for each field.
FAQ
Before you submit
What should I include in a quote request?
Gross vehicle weight, axle configuration, deck length, pit or pitless preference, static or in-motion weighing, site country, destination port, preferred incoterm and estimated quantity. The more of these we have, the tighter the specification we return.
What is the typical lead time for a truck weighing scale?
Around 60 days from a confirmed drawing and order. The slot covers fabrication, surface treatment, load-cell fitting, factory calibration and packing. We confirm the exact window with the quotation rather than printing a blanket promise.
What is the minimum order quantity?
One unit. We routinely ship single machines for pilot sites as well as multi-unit frames for parks and ports.
Which payment and trade terms do you work with?
Payment is by T/T. We quote EXW, FCA, FOB, CNF, CIF, DAP or DDP so the comparison stays transparent against your landed-cost model.